OUR PROCESS FOR SOLAR PROJECT EXECUTION | |
---|---|
Load Assessment | Load assessment for light load and heavy load for buildings or industry in order to calculate the system capacity required. |
Pre-Feasibility Study | Prefeasibility study of the available area to structure and climate parameters for stability to support the module load, shading and grid accessibility connectivity. |
Vendor Finalization | Vendor finalization for equipment required all through the project along with qualified civil & electrical contractors. |
Project Planning | Project planning including preparation of detailed engineering drawings, project execution plans, system sizing and plant layout. |
Delivery off Equipment | Delivery of equipment to project site after comprehensive testing based on random sampling to ensure quality and consistency. |
Installation & Commissioning | Installation & commissioning of the plant's mounting structure, modules and other electrical equipment. This also covers the development of necessary monitoring system. Conducting test run and final handing over. |