OUR PROCESS FOR SOLAR PROJECT EXECUTION
Load Assessment Load assessment for light load and heavy load for buildings or industry in order to calculate the system capacity required.
Pre-Feasibility Study Prefeasibility study of the available area to structure and climate parameters for stability to support the module load, shading and grid accessibility connectivity.
Vendor Finalization Vendor finalization for equipment required all through the project along with qualified civil & electrical contractors.
Project Planning Project planning including preparation of detailed engineering drawings, project execution plans, system sizing and plant layout.
Delivery off Equipment Delivery of equipment to project site after comprehensive testing based on random sampling to ensure quality and consistency.
Installation & Commissioning Installation & commissioning of the plant's mounting structure, modules and other electrical equipment. This also covers the development of necessary monitoring system. Conducting test run and final handing over.